Lake Whitney CyrusOne
Data Centers
- General Contractor Peinado Construction
- Client / Owner CyrusOne
- Location Lake Whitney, Texas
- Completion Date Ongoing
Zero-Tolerance Infrastructure for the Cloud
Hyperscale server farms are arguably the most demanding projects in commercial construction, requiring absolute perfection in their underground utility networks. For the CyrusOne facility in Lake Whitney, Moss Utilities was tapped by Peinado Construction to install the heavy-duty water and utility infrastructure necessary to keep this massive data hub operational.
Unlike standard commercial builds, data centers demand oversized capacities and deep, highly complex routing to protect against environmental risks.
Engineered for Uptime
We recognize that in the data sector, infrastructure failure is catastrophic. Moss Utilities brought aggressive problem-solving to the Lake Whitney site, utilizing advanced 3D BIM modeling to avoid existing subterranean clashes before the excavators even arrived. By delivering pristine, high-capacity water and sanitary lines exactly on schedule, we provided Peinado Construction with the absolute certainty needed to move forward with the site’s highly technical vertical build.